BA EASA Part 145 Audit Checklist
×
Free BA EASA Part 145 Audit Checklist Checklist
Go digital today!
Convert your paper checklists into digital forms
Scan this QR code to use this paper checklist on your smartphone or tablet or visit https://safetyculture.com/
- Audit Title
- Audit Reference
- Auditor Name
- Conducted on Date
EASA Part 145 Audit Questions
- EASA 145.A.10 - Scope
- This Section establishes the requirements to be met by an organisation to qualify for the
issue or continuation of an approval for the maintenance of aircraft and components.
1. Line Maintenance should be understood as any maintenance that is carried out before flight to ensure that the aircraft is fit for the intended flight.
(a) Line Maintenance may include:
- Trouble shooting.
- Defect rectification.
- Component replacement with use of external test equipment if required.
Component replacement may include components such as engines and pro-
pellers.
- Scheduled maintenance and/or checks including visual inspections that will
detect obvious unsatisfactory conditions/discrepancies but do not require
extensive in depth inspection. It may also include internal structure, systems
and powerplant items which are visible through quick opening access panels/
doors.
- Minor repairs and modifications which do not require extensive disassembly and can be accomplished by simple means.
(b) For temporary or occasional cases (AD’s, SB’s) the Quality Manager may accept base maintenance tasks to be performed by a line maintenance organisation provided all requirements are fulfilled as defined by the competent authority.
(c) Maintenance tasks falling outside these criteria are considered to be Base Maintenance.
(d) Aircraft maintained in accordance with ‘progressive’ type programmes should be individually assessed in relation to this paragraph. In principle, the decision to allow some ‘progressive’ checks to be carried out should be determined by the assessment that all tasks within the particular check can be carried out safely to the required standards at the designated line maintenance station.
2. Where the organisation uses facilities both inside and outside the Member State such as satellite facilities, sub-contractors, line stations etc., such facilities may be included in the approval without being identified on the approval certificate subject to the maintenance organisation exposition identifying the facilities and containing procedures to control such facilities and the competent authority being satisfied that they form an integral part of the approved maintenance organisation.